How to Calculate Your HVAC Labor Rate (With a Worked Example)
· updated · 3 min read
Most shops set their labor rate by looking at what the shop down the road charges. That tells you what customers in your area will tolerate. It does not tell you whether your own rate covers your own costs, and those are two different questions.
A billed hour has to pay for a lot more than the technician's wage. Here is how to work out what it actually has to cover, step by step, with an example you can check against the free labor rate calculator on this site.
Start with the loaded hourly cost
The wage is the starting point, not the cost. On top of it sit payroll taxes, workers' comp, insurance and any benefits. Owners usually call this labor burden and express it as a percentage of wage.
Example: a technician earning $30 an hour with a 25% burden costs you $37.50 for every hour you pay them.
Count the hours you pay for but cannot bill
This is the line most rates miss. A technician paid for 40 hours a week does not bill 40 hours. Drive time, shop time, parts runs, training and callbacks you do not charge for all come out of the week.
Example: the same technician bills 30 hours and spends 10 paid hours on things no customer pays for. You still pay for all 40.
- Weekly labor cost: $37.50 x 40 paid hours = $1,500
Give every technician a share of the office
Rent, office staff, vehicles, insurance, software and everything else that keeps the doors open has to be paid out of billed hours too. Divide your monthly overhead by the number of technicians to get each one's share.
Example: $6,000 a month of overhead for this technician works out to $1,384.62 a week ($6,000 x 12 months / 52 weeks).
- Total weekly cost: $1,500 + $1,384.62 = $2,884.62
Spread the cost over the hours you actually bill
Now divide that weekly cost by billable hours, not paid hours.
- Cost per billable hour: $2,884.62 / 30 = $96.15
That is your break-even rate for this technician. Bill less than $96.15 an hour and every hour they work loses money, no matter how busy the schedule looks.
Add the margin you want to keep
Margin is a share of the price, not a markup on cost, so you divide by one minus the margin rather than multiplying.
- Billable rate for a 20% net margin: $96.15 / (1 - 0.20) = $120.19, or $121 rounded up
The number that moves the rate the most
Billable hours change the answer more than almost anything else. Run the same example with different splits of the same 40 paid hours:
- 34 billable, 6 non-billable: $106.05 an hour
- 30 billable, 10 non-billable: $120.19 an hour
- 25 billable, 15 non-billable: $144.23 an hour
Nothing about the wage or the overhead changed. Five fewer billable hours a week added about $24 to the rate this technician needs. That is why tightening routes, cutting callbacks and getting paperwork done on site often does more for profit than a raise in price.
What to do with your number
Put your own wage, burden, hours and overhead into the free labor rate calculator. It shows every step above, keeps your numbers in your browser so they are there when you come back, and can copy a link to the result for your accountant or business partner.
If the rate it gives you is well above what you charge today, look at billable hours before you look at price. If it is below, you have room to invest in the business or pay your people more.
In Altair Operating System, technician hours are tracked against each job from the technician's phone, so the billable and non-billable split above comes from what actually happened instead of an estimate.
Free tools for owners
- HVAC labor rate calculatorWork out the hourly rate a technician needs to bill to cover wage, burden, unbillable hours, overhead and your target margin.
- Technician pay calculator: hourly, flat rate or commissionCompare one week of technician pay three ways: hourly with overtime, flat rate by book hours, and commission on revenue.
- HVAC break-even calculatorFind how many jobs and how much revenue a month it takes to cover your fixed costs.